Archive: projects

Renewables Main References

Ramnicu-Valcea Shopping City 1.56 MWp

Ramnicu-Valcea Shopping City 1.56 MWp

This 1.56 MWp Full Engineering, Procurement, and Construction (EPC) solar photovoltaic system was built for NEPI Rockcastle's Ramnicu-Valcea Shopping City and is operating since 2023.

Highly efficient Longi solar panels mounted on durable Cleanergy structures ensure optimal energy capture and long-term performance. Sungrow inverters were selected for their reliability and advanced grid integration capabilities, ensuring smooth power conversion and system stability.

Renewables Main References

Promenada Mall Bucuresti 0.52 MWp

Promenada Mall Bucuresti 0.52 MWp

Designed to enhance energy efficiency and reduce reliance on conventional power sources, the solar photovoltaic system installed for NEPI Rockcastle's Bucharest Promenada Mall is operational since 2022.

This EPC project was delivered with a focus on high-quality components, efficiency, and long-term reliability, using Canadian Solar panels for optimal energy capture, mounted on durable SL Rack structures. The reliable Sungrow inverters, selected for their long-term performance and advanced grid integration capabilities, ensure smooth power conversion and system stability.

Renewables Main References

Piatra-Neamt Shopping City 1.4 MWp

Piatra-Neamt Shopping City 1.4 MWp

Operational since 2023 this full Engineering, Procurement, and Construction (EPC) 1.4 MWp photovoltaic system aligns with NEPI Rockcastle's commitment to innovation and sustainability.

Focused on high-quality components, efficiency, and long-term reliability, the solution uses highly efficient Longi solar panels, mounted on durable K2 structures. The reliable Sungrow inverters have advanced grid integration capabilities, and ensure smooth power conversion and system stability.

Renewables Main References

Deva Shopping City 3.88 MWp

Deva Shopping City 3.88 MWp

Increasing energy efficiency and reducing reliance on conventional power sources, the Deva Shopping City 3.88 MWp photovoltaic system aligns with NEPI Rockcastle's commitment to innovation and sustainability and is operational since 2023.

A Full Engineering, Procurement, and Construction (EPC) project, the system is designed with efficient, long-term reliable, high-quality components, using highly efficient Longi solar panels, mounted on durable Cleanergy structures. Reliable Sungrow inverters with advanced grid integration capabilities ensure smooth power conversion and system stability.

Renewables Main References

Sibiu Shopping City 4.59 MWp

Sibiu Shopping City 4.59 MWp

Built for NEPI Rockcastle's Sibiu Shopping City, this 4.59 MWp Full Engineering, Procurement, and Construction (EPC) solar photovoltaic project showcases our shared commitment to renewable energy and environmental responsibility.

Designed with a focus on high-quality components, efficiency, and long-term reliability, the system uses highly efficient Longi solar panels mounted on durable Cleanergy structures for optimal energy capture and long-term performance. Sungrow inverters were selected for their reliability and advanced grid integration capabilities, ensuring smooth power conversion and system stability. Operational since 2023.

Renewables Main References

Galați Shopping City 2.5 MWp

Galați Shopping City 2.5 MWp

This 2.5 MWp photovoltaic system aligns with NEPI Rockcastle's commitment to innovation and sustainability. Operational since 2023, the Galați Shopping City Full Engineering, Procurement, and Construction (EPC) solar photovoltaic project was built with a focus on high-quality components, efficiency, and long-term reliability.

Highly efficient Longi solar panels are mounted on durable Cleanergy structures for optimal energy capture and long-term performance. Sungrow inverters were selected for their reliability and advanced grid integration capabilities, ensuring smooth power conversion and system stability.

Renewables Main References

Nimet 1 Targoviste 3.1 MWp

Nimet 1 Targoviste 3.1 MWp

Providing increased energy efficiency and reducing reliance on conventional power sources, a 3.1 MWp Full Engineering, Procurement, and Construction (EPC) solar photovoltaic project was built by ENEVO Group in Targoviste, for the major European producer of steel bars and tubes Nimet
Operational since 2023 the project shows our commitment to innovation and sustainability and was designed with a focus on high-quality components, efficiency, and long-term reliability.
The photovoltaic park uses highly efficient Canadian Solar panels mounted on durable Solar SK structures and SMA inverters that ensure smooth power conversion and system stability.

Renewables Main References

Promenada Craiova 5.8 Mwp

Promenada Craiova 5.8 Mwp

This biggest carport in Romania and the biggest C&I PV deployment for a commercial mall, this Full EPC project in Craiova aligns with NEPI Rockcastle’s commitment to innovation and sustainability, providing increased energy efficiency and reducing reliance on conventional power sources.

Created with high-quality components, for optimal efficiency and long-term reliability, the system is built on Aerocopmact and K2 structures. The carport uses Longi and Trinasolar panels and Sungrow inverters for optimal solar energy capture and efficiency.
Integrated in the dispatch center, providing energy in the grid and operating since 2023.

Automation Main References

ENEVO Cloud Solutions

ENEVO Cloud Solutions

ENEVO Group provides solutions for the complete energy management ecosystem: from on-premises utility scale dispatch centers and cloud-based monitoring & control platforms, to mobile apps for PV monitoring and showroom displays.

  • Dispatch Centers
  • PV SCADA SaaS
  • iOS & Android PV Monitoring apps
Automation Main References

Cyber Security OT Training Platform

Cyber Security OT Training Platform

Designing three distinct Process Automation Environments for an Oil Refinery, Reverse Osmosis Treatment Plant, and Automation Transfer Switch.

  • Design process automation environments for an Oil Refinery, Reverse Osmosis Treatment Plant, and Automation Transfer Switch.
  • Build a unified platform representing dynamics for all three environments.
  • Conduct a detailed cybersecurity audit for all three automation environments.
Replacement of the critical ESD System Switches with Transmitters

Upgrade of total plant shutdown critical Emergency Shutdown System (ESD) switches with transmitters at AinDar GOSP-2, AinDar GOSP-3, Shedgum GOSP6 in order to improve the safety & reliability of the plant.

  • Design and implementation of the instrumentation      replacement
  • Fabrication & Installation Services
  • Instrumentation Configuration
  • DCS Update
  • TRICONEX system update
Explore more