Power T&D Success Story

Nehoiasu HPP

Nehoiasu HPP (42MW) is situated on the Buzau river, in Central-Eastern Romania.

Together with TIAB SA, ENEVO Group implemented the project for refurbishment of the hidro power plant’s 20kV Substation, including new medium voltage Switchgears, protection and metering systems and a new 110/20kV SCADA.

  • Basic and detailed engineering
  • MV switchgear procurement
  • SCADA and protection systems design
  • Protection relays configuration
  • FAT and SAT
  • Installation, Testing and Commissioning