Automation Success Story

Mireasa Battery Energy Storage

SCADA for the 110/20kV Substation.

Integration of BESS stage 1 (6x4 MWh) components over IEC60870-5 104 protocol.

Integration of wind farm control system.

Integration of Monsson – designed cooling system for BESS including Temperature, pressure and flow transmitters / digital switches.

Development of Joint-Control solution for wind farm and BESS.