Turn-key refurbishment of 34.5 GIS Substation and 2X50 MVA Transformers

About This Project

Expertise contracted ENEVO Group to upgrade and refurbish a 34.5 kV GIS Substation that powers 2 Caster sections of Hadeed Plant. The most challenging aspect of the project was commissioning timeframe of just 10 days, the shutdown period of the factory. The substation and the transformers were successfully commissioned on time.

The project works consisted in:

  • Replacement of 2X30/40 MVA Siemens Transformers with new 2X 40/50 MVA Siemens Transformers
  • Replacement of existing GIS switchgear lineup with latest Siemens GIS switchgears
  • Replacement of 34.5 kV primary and 13,8 kV secondary power cables
  • Civil and erection works

Key services

  • Basic and detailed design
  • Procurement, delivery, installation and commissioning of new Siemens transformers
  • Procurement, delivery, installation and commissioning of new Siemens GIS switchgears
  • Protection Relay coordination and configuration
  • Automatic transfer switch functionality, interlocks and interconnection
  • SCADA integration
Category
Control Algorithm, Design, MV Switchgear, SCADA, Substation