Complete SCADA and protection system for the hydropower development of Livezeni-Bumbesti sector of Jiu River

About This Project

Livezeni-Bumbesti sector of Jiu River development consists of 2 hydro power plants  Bumbesti and Dumitra and Livezeni dam and microhydro power plant,situated in the Jiu River in Romania. Dumitra Power Plant is equipped with 3 Francis turbines having a total installed power of 24.5 MW. Bumbesti Power Plant is equipped with 3 Francis turbines with a total power of 54 MW.

ENEVO Group was contracted to engineer, design, supply and commission the complete hardware and software solution for the DCS and dispatch centers of the three HPPs and for the central dispatch center of the entire development.

Key services:

  • Basic and Detailed engineering
  • Equipment Supply
  • Installation, Testing and Commissioning
  • PLC Programming
  • Protection Relay configuration
  • Communication network development
  • SCADA software development
  • Technical assistance
  • SCADA integration of all equipment related to the automation system of the HPPs
Category
Control Algorithm, Design, Dispatch, Hydro Engineering